Servicing Orange & surrounds · Free measure & quote · Enquire online ·  Tap to call
Sizing guide · Orange · Central West NSW

How many metres of fence, posts and panels does your Orange block need?

A typical Orange quarter acre block, about 1,000 square metres at 20m by 50m, has around 120 metres of boundary and usually gets 90 to 100 metres of it fenced, because the front stays open. A single rear boundary is 18 to 22 metres. One side run from the house line to the back is 30 to 40 metres. At 2.4m bays, 40 metres needs 17 panels and 18 posts, and those 18 holes swallow about a cubic metre of concrete. Size it below, then price it.

Fence quantity and price estimator

Set the length of fence line and the estimator sizes and prices the job. It answers how big, not just what it costs, so use the metres and gate counts to check any quote you have already been given.

A single suburban side or rear boundary in Orange is usually 20m to 45m. A full perimeter on a quarter acre block is 90m to 100m.
Count pedestrian gates only here. A 0.9m to 1.0m gate takes two posts. Vehicle gates are further down in the extras.
Extras
Estimated range $4,100 - $6,000

Indicative Orange region range for 2026, supplied and installed with frost rated footings. A fixed price needs a site measure.

What this estimate assumes

  • Colorbond at 1.8m is the base rate at $90 to $130 per metre. Timber, height and ground conditions scale from there.
  • Posts at 2.4m bays in 300mm holes, 750mm deep, which is our standard for Orange frost and reactive basalt clay.
  • Gate allowance covers a pedestrian gate with adjustable hinges and a latch, and it scales with the material and height you pick.
  • Old fence removal is allowed at a typical 30m to 50m run. Much longer jobs are quoted per metre at $15 to $35.
  • Excludes retaining walls, boundary surveys, engineered wind design and pool barrier certification. Pool fencing is priced separately on the pool fencing page.
  • Rural fencing is quoted per 100m rather than per metre. Use the rural fencing page and the worked paddock numbers below.

How to measure your fence line properly, in about 15 minutes

  1. Find the corners first. Look for survey pegs or the old fence corner posts. If the pegs are there, photograph each one with a shoe or a tape in the frame so you can prove where it was. If they are gone and your neighbour agrees the old fence is on the line, work off the old fence.
  2. Use a 30m open reel tape, not a builder’s 8m tape. Two people, dragged along the ground on the actual line, not held up in the air and not stretched across a corner. A phone measuring app is fine as a sanity check and useless as a quote basis.
  3. Measure each run separately and label it. Sketch the block on paper, mark the runs A, B and C, and write the metres on each. Photograph the sketch. That single photo saves more confusion than anything else you can do.
  4. Note the fall. Stand at one end and sight along. If the ground drops more than about a step over a 2.4m bay, the panels will need stepping, which changes the post count and the panel heights. Take a photo down the line from both ends.
  5. Mark the obstacles. Trees within a metre of the line, the water meter, the sewer or septic run, the air conditioner, downpipes, the clothesline, and anything that changes where a post can physically go. Peg your irrigation.
  6. Photograph the access. The gap down the side of the house, the front gate width, and the kerb. If a barrow cannot get through, the labour changes.

Rules of thumb and how much to allow for waste

Fence lineBays at 2.4mPosts, single runPanelsConcrete at 300mm x 750mm20kg bags if mixing by handSpoil to cart away
10m5650.32 cubic metres360.4 cubic metres
20m91090.53 cubic metres600.7 cubic metres
30m1314130.74 cubic metres840.9 cubic metres
40m1718170.95 cubic metres1081.2 cubic metres
60m2526251.38 cubic metres1561.7 cubic metres
100m4243422.28 cubic metres2582.9 cubic metres
  • Posts. Bays plus one for each separate run, plus one at every corner, plus two heavier posts for every gate. Corner posts are shared between two runs, so do not count them twice.
  • Wastage. Allow 5 per cent on rails, screws and palings. There is always one cut bay per run, because boundaries are never a neat multiple of 2.4 metres.
  • Ground clearance. Leave 50mm to 100mm under a Colorbond panel or run a plinth. A panel sitting in wet clay is the fastest way to void a sheet warranty.
  • Gate widths. 0.9m to 1.0m for a pedestrian gate, 3.0m to 3.6m for a double vehicle gate, and 4.5m or wider for a truck or a float on a rural entrance. Measure the mower and the wheelie bin before you settle on a pedestrian gate.
  • Rural. Hinge joint comes in 100m rolls. Star pickets every 4m to 5m, strainer assemblies at every corner and about every 150m to 200m of straight run. An 800m paddock perimeter is 8 rolls plus 4 corner assemblies.

Rather we measured it?

The free measure takes half an hour, checks the ground for rock and fall, and produces a fixed written quote in 2 business days. No obligation.

Worked example

A real Orange block, added up

Take a common North Orange block: 20 metres wide, 48 metres deep, 960 square metres, a brick home set 10 metres back from the front boundary. The owner wants the rear and both sides done and the front left open, with a pedestrian gate on one side and a double gate on the other for the trailer.

  • Rear boundary: 20 metres.
  • Side A, from the front building line to the rear corner: 38 metres, less a 1.0 metre pedestrian gate, so 37 metres of fence.
  • Side B, same length: 38 metres, less a 3.0 metre double gate, so 35 metres of fence.
  • Total fence line: 92 metres, plus 4 metres of gate openings.
  • Posts: rear 9 bays and 10 posts, side A 16 bays and 17 posts, side B 15 bays and 16 posts, less 2 shared corner posts, plus 2 heavier gate posts. That is 43 posts.
  • Concrete: 43 holes at 300mm by 750mm is about 2.3 cubic metres, or roughly 2.9 cubic metres of spoil once it is dug out and bulked up. Around three trailer loads.

Now the money, at 2026 Orange rates for 1.8m Colorbond:

  • 92 metres at $90 to $130 per metre: $8,280 to $11,960
  • Pedestrian gate: $450 to $750
  • Double swing vehicle gate, 3.0m: $1,200 to $2,200
  • Removing and disposing of the old fence, 92 metres at $15 to $35: $1,380 to $3,220
  • Total: $11,310 to $18,130, before any neighbour contribution

Both side boundaries and the rear are dividing fences, so under the NSW Dividing Fences Act 1991 the adjoining owners normally contribute half of the fence of a sufficient standard, though not half of a gate that only benefits you. On a job like this the owner’s real out of pocket usually lands between $6,000 and $10,000. If that is more than you had in mind, the staging options are on the budget boundary fence page.

The sizing mistake that costs the most here

Forgetting the returns. Almost every homeowner measures the three boundaries and forgets the short sections that run from the corners of the house out to the side boundary. On a typical Orange block that is another 6 to 12 metres of fence, two more gate posts, and $600 to $1,600 that was not in your head when you set the budget. The second one is treating a fall as flat. Orange blocks in Clifton Grove and on the Canobolas side often drop a metre or more across a side boundary, and stepping panels down that fall adds a post at each step and pushes some panels to the next height up. The third is ordering to the plan dimension rather than the ground dimension: the deposited plan gives you the horizontal distance, and a fence run over undulating ground is always a little longer.

When you should not trust your own measurement

If the survey pegs are missing and your neighbour has a different idea of where the line sits, stop measuring and get a boundary identification survey. In the Central West that is roughly $1,200 to $2,200 in 2026, and it is dramatically cheaper than taking down a finished fence that turns out to be 300mm onto someone else’s land. The same applies if there is a retaining wall, an easement or a drainage reserve involved. We will always tell you at the measure when we think a surveyor is the right call, even though it delays the job, and the council rules that go with it are on fence council approval in Orange. Rural blocks around Borenore and the villages are quoted per 100 metres, not per metre, so measure the paddock sides in hundreds and tell us the total.

Sizing questions we get asked

How many metres of fencing do I need for a typical Orange block?
A standard quarter acre block in Orange, roughly 1,000 square metres at about 20m by 50m, has about 120 metres of boundary, of which 90 to 100 metres usually gets fenced because the front is left open. A single rear boundary is normally 18 to 22 metres and a side run from the house line to the back fence is 30 to 40 metres. Always measure along the ground rather than off the deposited plan.
How many posts do I need for a 40m fence?
At the standard 2.4m bay spacing, 40 metres is 17 bays and 18 posts for a single straight run. Add one post at every corner where two runs meet, and two heavier posts for every gate. Order about 5 per cent extra on rails, screws and palings to cover cuts and breakages.
How much concrete goes into a fence post hole?
A 300mm wide by 750mm deep hole holds about 53 litres, which is roughly 6 bags of 20kg premix per post. An 18 post fence is therefore close to one cubic metre of concrete, or a bit over 100 bags. That is why anything past about 20 metres gets batch mixed or delivered rather than bought in bags.
What is the most expensive measuring mistake in Orange?
Forgetting the returns. People measure the three boundaries and forget the 3 to 6 metre sections that run from each corner of the house out to the side boundary, which is another 6 to 12 metres of fence and two more gate posts. The second most expensive is treating a sloping run as flat, because stepping panels down a fall adds a post and a taller panel at each step.
Do I need a surveyor to find my boundary?
Only if the survey pegs are gone and your neighbour disagrees about where the line sits. A boundary identification survey in the Central West runs roughly $1,200 to $2,200, which is far cheaper than moving a finished fence. Where the old fence is on the line and both households agree, rebuilding on the same alignment is normal practice.
How much fencing do I need for a rural paddock?
Rural work is quoted per 100 metres, so measure the paddock sides in hundreds. A square 4 hectare paddock is 200 metres a side and 800 metres in total, which is 8 rolls of hinge joint plus strainer assemblies at every corner and roughly every 150 to 200 metres of straight run. At $1,500 to $3,500 per 100 metres that is $12,000 to $28,000.
Get a price

Send us your measurements and we will size it properly

Send your run lengths, or just the address, and we will measure on site and email a fixed written quote with the post and panel counts listed, within 2 business days.

We reply within 1 business day. Free, no obligation.

Get the metres, the posts and the price in one document

Free measure across Orange, Lucknow, Spring Hill, Millthorpe, Clifton Grove and Borenore, with a fixed written quote in 2 business days.

 Tap to call