Servicing Orange & surrounds · Free measure & quote · Enquire online ·  Tap to call
Approvals & compliance · Orange & the Central West

Do you need council approval for a fence in Orange?

Usually not, and the exceptions are where all the trouble lives. Exempt development and the height limits that come with it, why a corner block is different, the heritage streets where a steel fence will be refused, and the pool barrier rules that sit outside all of it.

The general rule

Most fences here are exempt development.

Usually not. Most residential fences in NSW are exempt development under the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, which means no development application to Orange City Council at all, provided the fence meets every one of the code's standards for height, material, location and setback.

Read that last clause again, because it is the trap. Exempt development is not a discretion or a rough guide, it is a checklist, and it is all or nothing. A fence that meets every standard but one is not a mostly-exempt fence, it is an unapproved structure. That is why we would rather spend ten minutes confirming your zoning before the quote than have you find out afterwards.

Heights

How high, and which council.

The rule of thumb most people want is 1.8m behind the building line in a residential zone, with front fences held much lower, commonly around 1.2m and lower again near an intersection. Treat those as orientation only, not as the answer for your block, and here is the local reason why.

This is a real and constant source of confusion around here, and it is worth being concrete about it. The city itself and its immediate suburbs are Orange City Council. Head west toward Borenore and you are into Cabonne Council. Head south toward Millthorpe and you are into Blayney Shire. Neighbours a few kilometres apart, three different consent authorities, three different LEPs and DCPs. Advice your mate got for his block in town may simply not apply to yours.

Corner blocks deserve their own warning. A solid 1.8m fence run right up to the corner of an intersection creates a sight-line problem, and both the exempt code and council controls deal with it through splays and reduced heights near the corner. If you are on a corner in Lucknow or anywhere else in the district, assume the front and secondary street frontages have rules and ask before you plan the run.

Heritage

The heritage streets where steel is refused.

Here is the one that catches people constantly. The exempt development pathway does not apply to a heritage item or to land in a heritage conservation area, which means an identical fence needs a development application in one street and nothing at all three streets over. Parts of central Orange are covered, and Millthorpe is a conservation-listed village in its entirety.

If you are in one of those streets, the good news is that the right answer usually looks better anyway. A properly proportioned timber picket in a profile that suits the period is what those frontages were built with, it photographs beautifully, and it is the fence the street wants. It does need oiling and it will not last as long as steel, which is a fair trade for living somewhere that looks like that. See the timber fencing page for picket profiles, and does a new fence add value before selling for why matching the street is worth money.

Behind the building line, in a back yard nobody sees from the street, heritage controls are generally far more relaxed and Colorbond is usually fine. Confirm it, do not assume it.

Pools

Pool barriers are a separate world.

Everything above this line is planning law. A pool barrier is not planning law, it is safety law, and it sits under the Swimming Pools Act 1992 with its own register, its own standard in AS 1926.1, and its own inspection and certificate regime through Orange City Council. None of the exemptions on this page help you here.

One local detail that costs Orange pool owners their certificate more than anything else: the gap under the barrier. AS 1926.1 limits the gap between the bottom of the barrier and the ground, and our reactive basalt clay shrinks away over a dry summer. A barrier that passed cleanly on installation can open a non-compliant gap underneath by its second or third February without anyone touching it. If your certificate is due and you have not looked along the bottom of the fence, look. Details on the pool fencing page.

Consequences

What happens if you skip it.

Nobody from council drives around measuring fences. That is why people talk themselves into it. What actually happens is that a neighbour complains, or a purchaser's solicitor asks for an approval that does not exist, and by then you are paying for the fence twice.

Worked example. A corner block near the CBD, owner wants 1.8m Colorbond along both street frontages for privacy. Built as asked at $110 per metre over 34m: $3,740. A neighbour complains about the sight line at the intersection, council orders the secondary frontage reduced, and 14m has to come down and be rebuilt lower: roughly $1,540 to remove and rebuild, so the shortcut cost about $1,540 and a lot of goodwill. The five-minute planning call would have produced a compliant design at the same original price. We now make that call as part of the quote on any corner block, front fence or heritage street, and it costs you nothing.

Separately from planning, remember the neighbour. A boundary fence is normally a shared 50-50 cost under the Dividing Fences Act 1991, started with a Fencing Notice and a written quote attached. Approval and cost-sharing are two different conversations and you may need both. See how to choose a fencer in Orange.

FAQ

Common questions about fence approvals in Orange.

Do I need council approval for a fence in Orange NSW?

Usually not. Most residential fences in NSW are exempt development under the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, which means no development application to Orange City Council provided the fence meets every one of the code's standards for height, material, location and setback. Miss one standard and the whole exemption falls away, which is the part people get wrong. The exemption also does not apply to heritage items, land in a heritage conservation area, or an environmentally sensitive area, and a pool barrier has separate obligations of its own.

How high can a fence be in Orange without approval?

As a rule of thumb, a 1.8m boundary fence behind the building line in a residential zone is the normal exempt height, and front fences are held much lower, commonly around 1.2m and lower again on a corner block near an intersection for sight lines. Those are the general figures and not a substitute for the current code and your specific zoning. Because Orange City Council, Cabonne Council and Blayney Shire Council each administer their own LEP over different parts of this district, the answer genuinely depends on which side of a boundary road you live on.

Do I need approval for a fence in a heritage conservation area in Orange?

Yes, and this catches people constantly. The exempt development pathway does not apply to a heritage item or land in a heritage conservation area, so a front fence there needs a development application even though the identical fence three streets away needs nothing. Orange has heritage conservation areas covering parts of the older central streets, and Millthorpe is a conservation-listed village under Blayney Shire. A Colorbond front fence in those streets is not merely a taste question, it will be refused, and a period-appropriate timber picket is the answer.

What are the pool fence rules in Orange NSW?

Pool barriers sit outside the ordinary fencing rules entirely. Under the Swimming Pools Act 1992 the pool must be registered on the NSW Swimming Pool Register, and the barrier must comply with AS 1926.1 covering effective height, gaps, non-climbable zones, and a gate that self-closes and self-latches from every position. Orange City Council inspects pool barriers and issues certificates of compliance. You need a valid certificate before you sell, and before you enter into a tenancy agreement at a property with a pool. This is the one part of fencing where getting it wrong is a safety issue first and a paperwork issue second.

What happens if I build a fence without approval in Orange?

Council can issue an order to modify or remove it, and you wear the cost of both the original fence and the fix. Enforcement usually starts with a neighbour complaint rather than a patrol, so the risk is not theoretical, it is whoever you have annoyed. The other bite comes at sale, when a purchaser's solicitor asks for approval for an obviously non-exempt structure and cannot be given one. It is a five-minute phone call to the council duty planner before you build, and it is the cheapest five minutes on the whole job.

Three councils, one district.

Lucknow Spring Hill Millthorpe Clifton Grove Borenore Orange CBD North Orange Bletchington Calare Glenroi Nashdale Cargo March Byng All areas

Not sure if your fence needs approval?

Tell us where the block is and what you want. We check the zoning and the heritage mapping as part of the quote, so the fence you get is the fence you keep.

 Tap to call